Form 6-K
United States
Securities and Exchange Commission
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the
Securities Exchange Act of 1934
For the month of
February 2011
Vale S.A.
Avenida Graça Aranha, No. 26
20030-900 Rio de Janeiro, RJ, Brazil
(Address of principal executive office)
(Indicate by check mark whether the registrant files or will file annual reports under cover
of Form 20-F or Form 40-F.)
(Check One) Form 20-F þ Form 40-F o
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(1))
(Check One) Yes o No þ
(Indicate by check mark if the registrant is submitting the Form 6-K in paper
as permitted by Regulation S-T Rule 101(b)(7))
(Check One) Yes o No þ
(Indicate by check mark whether the registrant by furnishing the information contained in this
Form is also thereby furnishing information to the Commission pursuant to Rule 12g3-2(b) under the
Securities Exchange Act of 1934.)
(Check One) Yes o No þ
(If Yes is marked, indicate below the file number assigned to the registrant in connection
with Rule 12g3-2(b). 82- .)
|
|
|
|
|
Production Report |
|
|
|
|
Vale 2010 Production Report
A YEAR OF STRONG RECOVERY
Rio de Janeiro, February 24, 2011 Vale S.A. (Vale) operations had an outstanding
performance in 2010. After facing the challenges stemming from the global recession of 2008/2009,
one of the deepest in modern economic history, there was a strong recovery of the output of most of
our products.
The production of iron ore of 308 Mt1 in 2010 achieved an all-time high figure. It was
29.4% above 2009 and 1.5% higher than the previous record level of 303 Mt attained in 2007, a year
of fast global demand growth and full capacity operation. Carajás, which has the best iron ore
deposits in the world, produced 101 Mt in this year, establishing a new record mark. At the same
time, pellet production was 49 Mt, another all-time figure, surpassing the previous record of 45 Mt
of 2007. In addition, new records were reached in the production of bauxite, at 14 Mt, and coal,
6.9 Mt.
The bulk of our Canadian nickel operations, encompassing the Sudbury and Voisey Bay sites, were
negatively affected by a long strike, which started in 3Q09. Despite the labor interruption, we
managed to keep the operations running, albeit at low levels of capacity utilization. With the end
of the strike in Sudbury, the output of refined nickel began to increase in 3Q10 and in the last
quarter of the year climbed to an annualized rate of 260,000 metric tons, an almost normal level of
activity, even higher than the production number for 2007, of 248,000 metric tons.
The move towards normalization of our base metals production and its minor and precious metals
by-products is taking place against a backdrop of high and rising prices, contributing to a
significant enhancement of our financial performance.
In the first weeks of this year there were heavy rains and flooding in some parts of Brazil
where we have 100% of our iron ore operations and in the state of Queensland, Australia where
our central Australian office, in Brisbane, and some of our coal mines are located. Although the
rainfall was far heavier than the seasonal standard, the preemptive actions taken by our bulk
materials operations were able to minimize output losses.
In the case of iron ore, so far losses have been minimal, estimated to reach only 600,000 metric
tons (200,000 in the Southern System and 400,000 in the Southeastern System), which are in
accordance with the seasonality pattern for the first quarter of each year and represent only a
minimal portion of the total production target for 2011, 311 Mt2, thus being easily
recoverable over the year. On the other hand, the estimated losses for our coal production in
Queensland, at 500,000 metric tons, are relevant given the still small scale of Vales Australian
operations.
Given the strong global demand for minerals and metals and the positive expectations for the near
term, the excellence of our current operations and the upcoming capacity additions from soon to be
delivered new projects, as well as those which are already being commissioned and ramped up, we
expect the continuation of the outstanding operational performance and a significant contribution
to shareholder value creation.
Annual production
|
|
|
|
|
|
|
|
|
|
|
|
|
000 metric tons |
|
2008 |
|
|
2009 |
|
|
2010 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Iron orea |
|
|
301,696 |
|
|
|
237,953 |
|
|
|
307,795 |
|
Pelletsa |
|
|
44,763 |
|
|
|
23,856 |
|
|
|
48,993 |
|
Coal |
|
|
4,094 |
|
|
|
5,420 |
|
|
|
6,893 |
|
Nickel |
|
|
275 |
|
|
|
187 |
|
|
|
179 |
|
Copper |
|
|
312 |
|
|
|
198 |
|
|
|
207 |
|
Bauxite |
|
|
11,628 |
|
|
|
12,461 |
|
|
|
14,332 |
|
Alumina |
|
|
3,431 |
|
|
|
5,910 |
|
|
|
5,805 |
|
Aluminum |
|
|
542 |
|
|
|
459 |
|
|
|
447 |
|
Potash |
|
|
607 |
|
|
|
717 |
|
|
|
662 |
|
|
|
|
a |
|
Including Samarcos attributable production. |
|
|
|
1 |
|
Mt = million metric tons |
|
|
|
Kt = thousand metric tons |
|
|
|
mt = metric tons |
|
2 |
|
Without Samarcos attributable production. |
1
|
|
|
|
|
Production Report |
|
|
|
|
BULK MATERIALS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
IRON ORE |
|
|
63,443 |
|
|
|
82,614 |
|
|
|
80,262 |
|
|
|
237,953 |
|
|
|
307,795 |
|
|
|
-2.8 |
% |
|
|
26.5 |
% |
|
|
29.4 |
% |
Southeastern System |
|
|
24,554 |
|
|
|
31,530 |
|
|
|
30,028 |
|
|
|
88,503 |
|
|
|
116,913 |
|
|
|
-4.8 |
% |
|
|
22.3 |
% |
|
|
32.1 |
% |
Itabira |
|
|
8,009 |
|
|
|
10,621 |
|
|
|
10,036 |
|
|
|
31,136 |
|
|
|
38,704 |
|
|
|
-5.5 |
% |
|
|
25.3 |
% |
|
|
24.3 |
% |
Mariana |
|
|
7,921 |
|
|
|
9,697 |
|
|
|
8,933 |
|
|
|
28,922 |
|
|
|
36,635 |
|
|
|
-7.9 |
% |
|
|
12.8 |
% |
|
|
26.7 |
% |
Minas Centrais |
|
|
8,624 |
|
|
|
11,212 |
|
|
|
11,058 |
|
|
|
28,444 |
|
|
|
41,574 |
|
|
|
-1.4 |
% |
|
|
28.2 |
% |
|
|
46.2 |
% |
Midwestern System |
|
|
683 |
|
|
|
1,088 |
|
|
|
1,268 |
|
|
|
956 |
|
|
|
4,208 |
|
|
|
16.5 |
% |
|
|
85.6 |
% |
|
|
340.2 |
% |
Corumbá |
|
|
423 |
|
|
|
749 |
|
|
|
876 |
|
|
|
423 |
|
|
|
2,829 |
|
|
|
16.9 |
% |
|
|
107.0 |
% |
|
|
568.7 |
% |
Urucum |
|
|
260 |
|
|
|
339 |
|
|
|
392 |
|
|
|
533 |
|
|
|
1,379 |
|
|
|
15.5 |
% |
|
|
50.8 |
% |
|
|
158.8 |
% |
Southern System |
|
|
14,599 |
|
|
|
20,258 |
|
|
|
18,214 |
|
|
|
55,242 |
|
|
|
74,703 |
|
|
|
-10.1 |
% |
|
|
24.8 |
% |
|
|
35.2 |
% |
Minas Itabiritos |
|
|
5,241 |
|
|
|
8,275 |
|
|
|
7,470 |
|
|
|
18,124 |
|
|
|
30,050 |
|
|
|
-9.7 |
% |
|
|
42.5 |
% |
|
|
65.8 |
% |
Vargem Grande |
|
|
5,234 |
|
|
|
5,938 |
|
|
|
5,127 |
|
|
|
20,578 |
|
|
|
22,065 |
|
|
|
-13.7 |
% |
|
|
-2.0 |
% |
|
|
7.2 |
% |
Paraopeba |
|
|
4,124 |
|
|
|
6,044 |
|
|
|
5,617 |
|
|
|
16,539 |
|
|
|
22,587 |
|
|
|
-7.1 |
% |
|
|
36.2 |
% |
|
|
36.6 |
% |
Northern System |
|
|
20,940 |
|
|
|
26,997 |
|
|
|
28,007 |
|
|
|
84,638 |
|
|
|
101,171 |
|
|
|
3.7 |
% |
|
|
33.7 |
% |
|
|
19.5 |
% |
Carajás |
|
|
20,940 |
|
|
|
26,997 |
|
|
|
28,007 |
|
|
|
84,638 |
|
|
|
101,171 |
|
|
|
3.7 |
% |
|
|
33.7 |
% |
|
|
19.5 |
% |
Samarco1 |
|
|
2,667 |
|
|
|
2,741 |
|
|
|
2,746 |
|
|
|
8,614 |
|
|
|
10,800 |
|
|
|
0.2 |
% |
|
|
3.0 |
% |
|
|
25.4 |
% |
|
|
|
1 |
|
Vales attributable production capacity of 50%. |
Vales iron ore production reached a new record in 2010, namely 307.8 Mt, with a
year-over-year increase of 29.4%, thus surpassing the 2007 record of 303.2 Mt.
Production was 80.3 Mt in 4Q10, 2.8% below 3Q10, which in light of seasonality is a very slight
decrease (4Q of each year tends to have a lower production than 3Q due to the beginning of the
rainy season in the last months of the year, while the third quarter is the seasonally strongest
quarter of the year for iron ore production).
Following its recovery in 3Q10, iron ore production in Carajás reached 28 Mt in 4Q10, expanding by
3.7% on a quarter-on-quarter basis and 33.7% year-on-year. Given its outstanding
performance in the second half of the year, the 2010 output level of 101.2 Mt surpassed the
previous record for Carajás, achieved in 2008, at 96.5 Mt.
The Southeastern System, which encompasses the Itabira, Mariana and Minas Centrais mining sites,
reached a production of 30.0 Mt, decreasing 4.8% over 3Q10 due to seasonal factors and rising 22.3%
over 4Q09.
The Southern System produced 18.2 Mt in 4Q10 against 20.2Mt in 3Q10, but increased 24.8% on a
year-on-year basis.
Our iron ore mines, Urucum and Corumbá, located in state of Mato Grosso do Sul, Brazil, near the
border with Bolivia and Paraguay, were aggregated under the newly created Midwestern System. It is
the smallest of our Systems, with a production of 1.3 Mt in 4Q10 and a quarter-on-quarter increase
of 16.5% and 85.6% year-on-year.
2
|
|
|
|
|
Production Report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PELLETS |
|
|
8,750 |
|
|
|
13,638 |
|
|
|
12,210 |
|
|
|
23,856 |
|
|
|
48,993 |
|
|
|
-10.5 |
% |
|
|
39.5 |
% |
|
|
105.4 |
% |
Tubarão I and II |
|
|
783 |
|
|
|
1,434 |
|
|
|
1,189 |
|
|
|
3,942 |
|
|
|
5,435 |
|
|
|
-17.1 |
% |
|
|
51.9 |
% |
|
|
37.9 |
% |
Fábrica |
|
|
0 |
|
|
|
1,058 |
|
|
|
1,016 |
|
|
|
235 |
|
|
|
3,809 |
|
|
|
-4.0 |
% |
|
|
n.m. |
|
|
|
1521.6 |
% |
São Luís |
|
|
0 |
|
|
|
1,656 |
|
|
|
1,154 |
|
|
|
3 |
|
|
|
4,545 |
|
|
|
-30.3 |
% |
|
|
n.m. |
|
|
|
177004.6 |
% |
Vargem Grande |
|
|
1,125 |
|
|
|
1,425 |
|
|
|
1,061 |
|
|
|
2,159 |
|
|
|
5,174 |
|
|
|
-25.5 |
% |
|
|
-5.7 |
% |
|
|
139.6 |
% |
Nibrasco |
|
|
2,150 |
|
|
|
2,395 |
|
|
|
2,493 |
|
|
|
5,791 |
|
|
|
8,958 |
|
|
|
4.1 |
% |
|
|
16.0 |
% |
|
|
54.7 |
% |
Kobrasco |
|
|
764 |
|
|
|
1,163 |
|
|
|
1,201 |
|
|
|
1,653 |
|
|
|
4,748 |
|
|
|
3.3 |
% |
|
|
57.2 |
% |
|
|
187.3 |
% |
Hispanobras1 |
|
|
452 |
|
|
|
560 |
|
|
|
493 |
|
|
|
577 |
|
|
|
1,948 |
|
|
|
-11.9 |
% |
|
|
9.1 |
% |
|
|
237.7 |
% |
Itabrasco |
|
|
815 |
|
|
|
1,049 |
|
|
|
769 |
|
|
|
1,471 |
|
|
|
3,621 |
|
|
|
-26.7 |
% |
|
|
-5.7 |
% |
|
|
146.1 |
% |
Samarco2 |
|
|
2,662 |
|
|
|
2,897 |
|
|
|
2,833 |
|
|
|
8,025 |
|
|
|
10,754 |
|
|
|
-2.2 |
% |
|
|
6.5 |
% |
|
|
34.0 |
% |
|
|
|
1 |
|
Vales attributable production capacity of 50.89%. |
|
2 |
|
Vales attributable production capacity of 50%. |
In 4Q10, pellet production was 12.2 Mt, 10.5% lower than the previous quarter but 39.5%
higher than 4Q09. The total volume produced in 2010 reached 49 Mt a new all-time high, 9.3%
higher than the 44.8 Mt record achieved in 2007.
There were some scheduled maintenance stoppages in 4Q10, which affected negatively output
performance. The plants were under maintenance in October, São Luis in November, and Tubarão I and
II in December while some Hispanobrás equipment was under maintenance during November.
Vargem Grande also had some operational issues, arising from the supply and quality of feed
received.
The three pellet plants of the 50%-owned Samarco JV, which have a nominal capacity of 21.0 Mtpy,
were operating at full capacity. Our attributable production was 2,833 Mt in 4Q10, 2.2% lower than
3Q10.
The Oman operations, in the industrial site of Sohar, Oman, are coming on stream. It has two
pellets plants, each with a capacity to produce 4.5 Mtpy, thus adding 9.0 Mtpy to our production
capacity. The two plants will produce direct reduction pellets.
Omans plant 1 is under commissioning and furnace heating, and is expected to start up production
in March. Plant 2 is being assembled and is expected to reach the ramp up stage by the end of the
first half of this year.
3
|
|
|
|
|
Production Report |
|
|
|
|
|
|
Manganese ore and ferroalloys |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MANGANESE ORE |
|
|
545 |
|
|
|
472 |
|
|
|
477 |
|
|
|
1,657 |
|
|
|
1,841 |
|
|
|
1.0 |
% |
|
|
-12.5 |
% |
|
|
11.1 |
% |
Azul |
|
|
513 |
|
|
|
372 |
|
|
|
391 |
|
|
|
1,382 |
|
|
|
1,550 |
|
|
|
5.1 |
% |
|
|
-23.8 |
% |
|
|
12.1 |
% |
Urucum |
|
|
32 |
|
|
|
55 |
|
|
|
41 |
|
|
|
169 |
|
|
|
184 |
|
|
|
-25.0 |
% |
|
|
27.2 |
% |
|
|
9.0 |
% |
Other mines |
|
|
0 |
|
|
|
46 |
|
|
|
46 |
|
|
|
105 |
|
|
|
106 |
|
|
|
-0.4 |
% |
|
|
n.m. |
|
|
|
0.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FERROALLOYS |
|
|
88 |
|
|
|
112 |
|
|
|
116 |
|
|
|
223 |
|
|
|
451 |
|
|
|
3.8 |
% |
|
|
32.1 |
% |
|
|
102.5 |
% |
Brazil |
|
|
34 |
|
|
|
50 |
|
|
|
55 |
|
|
|
99 |
|
|
|
207 |
|
|
|
9.0 |
% |
|
|
62.3 |
% |
|
|
109.2 |
% |
Dunkerque |
|
|
35 |
|
|
|
35 |
|
|
|
36 |
|
|
|
45 |
|
|
|
138 |
|
|
|
1.1 |
% |
|
|
2.6 |
% |
|
|
209.5 |
% |
Mo I Rana |
|
|
19 |
|
|
|
26 |
|
|
|
26 |
|
|
|
79 |
|
|
|
106 |
|
|
|
-2.5 |
% |
|
|
32.8 |
% |
|
|
33.6 |
% |
In 4Q10, manganese ore production was slightly higher than the previous quarter, coming
to 477,000 t against 472,000 t in 3Q10. The annual output increased 11.1% when compared to 2009,
reaching 1.8 Mt.
The production of Azul our largest manganese mine increased 5.1% on a quarter-on-quarter
basis, reaching 391,000t. The use of new equipment has contributed to improve mining performance.
The total production in 2010 was 12.1% above 2009.
Ferroalloy quarterly production was comprised of 51,000t of ferrosilicon manganese alloys (FeSiMn),
60,000t of high-carbon manganese alloys (FeMnHc) and 5,000 t of medium-carbon manganese alloys
(FeMnMC). The total output was slightly higher than previous quarter, increasing by 3.8%.
Production for 2010 was 451,000t, more than doubling relatively to 2009, but still lower than the
previous peak of 542,000t reached in 2007.
4
|
|
|
|
|
Production Report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
METALLURGICAL COAL |
|
|
659 |
|
|
|
814 |
|
|
|
770 |
|
|
|
2,527 |
|
|
|
3,057 |
|
|
|
-5.4 |
% |
|
|
16.9 |
% |
|
|
21.0 |
% |
Integra Coal |
|
|
198 |
|
|
|
296 |
|
|
|
279 |
|
|
|
1,184 |
|
|
|
1,151 |
|
|
|
-5.7 |
% |
|
|
41.0 |
% |
|
|
-3.1 |
% |
Broadlea |
|
|
25 |
|
|
|
0 |
|
|
|
0 |
|
|
|
252 |
|
|
|
101 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
-59.8 |
% |
Carborough Downs |
|
|
245 |
|
|
|
289 |
|
|
|
367 |
|
|
|
604 |
|
|
|
1,216 |
|
|
|
27.0 |
% |
|
|
50.0 |
% |
|
|
101.3 |
% |
Others |
|
|
191 |
|
|
|
229 |
|
|
|
124 |
|
|
|
487 |
|
|
|
590 |
|
|
|
-45.9 |
% |
|
|
-35.2 |
% |
|
|
21.1 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
THERMAL COAL |
|
|
607 |
|
|
|
1,057 |
|
|
|
976 |
|
|
|
2,892 |
|
|
|
3,832 |
|
|
|
-7.6 |
% |
|
|
60.7 |
% |
|
|
32.5 |
% |
El Hatillo |
|
|
368 |
|
|
|
830 |
|
|
|
830 |
|
|
|
1,143 |
|
|
|
2,991 |
|
|
|
0.0 |
% |
|
|
125.7 |
% |
|
|
161.8 |
% |
Integra Coal |
|
|
103 |
|
|
|
114 |
|
|
|
74 |
|
|
|
702 |
|
|
|
305 |
|
|
|
-35.1 |
% |
|
|
-28.0 |
% |
|
|
-55.8 |
% |
Broadlea |
|
|
27 |
|
|
|
0 |
|
|
|
0 |
|
|
|
497 |
|
|
|
165 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
-66.7 |
% |
Others |
|
|
110 |
|
|
|
113 |
|
|
|
72 |
|
|
|
551 |
|
|
|
371 |
|
|
|
-36.3 |
% |
|
|
-34.3 |
% |
|
|
-32.7 |
% |
Despite the adverse weather conditions in Australia and some operational issues, 2010
was our best year for coal operations, with all-time high levels of production for both
metallurgical and thermal coal, 3.057 Mt and 3.832 Mt, respectively, totaling 6.9 Mt.
In 4Q10 Vales coal production reached 1.75 Mt, which was comprised of 770,000 t of metallurgical
coal and 976,000 t of thermal coal.
Production of metallurgical and thermal coal at Integra Coal, in New South Wales, was 279,000 t and
74,000t, respectively, in 4Q10. Both metallurgical and thermal coal output were lower than in 3Q10.
Production at Carborough Downs, in Queensland, was 367,000 t in 4Q10, versus 289,000 t in 3Q10.
Although Carborough Downs completed a long wall move in 4Q10, the increase in its yield on this
quarter contributed to a higher output and its best ever quarterly performance.
Heavy and consistent rainfall during the fourth quarter resulted in 42 days of lost production at
all other mines in the state of Queensland.
The thermal coal mine of El Hatillo, an open pit coal mine in Colombia, is ramping up and was also
affected by bad weather conditions in the 4Q10 producing 830,000 t in 4Q10, in line with 3Q10.
5
|
|
|
|
|
Production Report |
|
|
|
|
BASE METALS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NICKEL |
|
|
30 |
|
|
|
44 |
|
|
|
65 |
|
|
|
187 |
|
|
|
179 |
|
|
|
45.7 |
% |
|
|
117.8 |
% |
|
|
-4.2 |
% |
Sudbury |
|
|
2 |
|
|
|
6 |
|
|
|
8 |
|
|
|
43 |
|
|
|
22 |
|
|
|
35.7 |
% |
|
|
450.1 |
% |
|
|
-48.5 |
% |
Thompson |
|
|
10 |
|
|
|
5 |
|
|
|
8 |
|
|
|
29 |
|
|
|
30 |
|
|
|
75.2 |
% |
|
|
-14.4 |
% |
|
|
3.5 |
% |
Voisey Bay |
|
|
4 |
|
|
|
10 |
|
|
|
25 |
|
|
|
40 |
|
|
|
42 |
|
|
|
160.7 |
% |
|
|
571.6 |
% |
|
|
6.6 |
% |
Sorowako |
|
|
15 |
|
|
|
22 |
|
|
|
20 |
|
|
|
69 |
|
|
|
78 |
|
|
|
-9.7 |
% |
|
|
34.7 |
% |
|
|
13.9 |
% |
Others* |
|
|
0 |
|
|
|
2 |
|
|
|
3 |
|
|
|
6 |
|
|
|
6 |
|
|
|
47.5 |
% |
|
|
n.m. |
|
|
|
0.0 |
% |
|
|
|
* |
|
External feed purchased from third parties and processed into finished nickel in our operations |
Total finished nickel production was 65,000 t in 4Q10, 45.7% up on a quarter-on-quarter
basis, being our highest quarterly output since 1Q09. Most of this increase about 15,000 t was
due to the significant contribution of Voisey Bay feed to refined nickel.
Voisey Bay mining and processing has been operating at full capacity for some time focusing on high
grade feed to supply the Clydach and Thompson refineries. At the same time, Sudbury mining was more
focused on high grade copper and was operating at levels much below capacity. Mining was ramped up
only after the end of the strike and given the relatively long production cycle, from mined nickel
to refined nickel, the fourth quarter still saw the numbers for refined nickel sourced from Sudbury
at low levels, increasing to only 8,000 t from 6,000 t in 3Q10.
During 1H11, one of the two furnaces of our Copper Cliff smelter in Sudbury will remain shutdown
for a minimum of 16 weeks, entailing an estimated output loss of 15,000 metric tons of finished
nickel.
Production at Thompson in 4Q10 was 8,300 t, 75.2% up from the previous quarter as the operations
had a one-month annual maintenance shutdown in 3Q10.
Finished nickel production sourced from Sorowako, Indonesia, was 19,600 t, down 9.7% from 3Q10 due
to a maintenance shutdown in October at the Matsuzaka refinery in Japan. It was up 34.7% on a
year-on-year basis as at 4Q09 the Sorowako matte was being diverted to the Clydach refinery to meet
demand requirements which contributed to lengthen the production cycle at that time.
The commissioning of the Onça Puma ferronickel project is completed, with the production of the
first metal was in the last week of January. The operation has a nominal production capacity of
58,000 t of nickel in ferronickel.
6
|
|
|
|
|
Production Report |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COPPER |
|
|
32 |
|
|
|
58 |
|
|
|
76 |
|
|
|
198 |
|
|
|
207 |
|
|
|
30.3 |
% |
|
|
132.8 |
% |
|
|
4.4 |
% |
Sossego |
|
|
28 |
|
|
|
32 |
|
|
|
30 |
|
|
|
117 |
|
|
|
117 |
|
|
|
-6.0 |
% |
|
|
8.8 |
% |
|
|
-0.1 |
% |
Sudbury |
|
|
2 |
|
|
|
14 |
|
|
|
14 |
|
|
|
42 |
|
|
|
34 |
|
|
|
-2.2 |
% |
|
|
477.6 |
% |
|
|
-19.9 |
% |
Thompson |
|
|
0 |
|
|
|
0 |
|
|
|
1 |
|
|
|
1 |
|
|
|
1 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
0.0 |
% |
Voiseys Bay |
|
|
0 |
|
|
|
11 |
|
|
|
16 |
|
|
|
24 |
|
|
|
33 |
|
|
|
52.7 |
% |
|
|
n.m. |
|
|
|
36.1 |
% |
Others |
|
|
2 |
|
|
|
1 |
|
|
|
15 |
|
|
|
14 |
|
|
|
22 |
|
|
|
925.6 |
% |
|
|
668.3 |
% |
|
|
61.8 |
% |
Vales copper production was 76,000t in 4Q10, an increase of 30.3% on a
quarter-on-quarter basis.
Production of copper in concentrates from the Sossego mine at Carajás was 6% lower than in the
previous quarter due to the smaller volumes of feed received by the plant during this quarter.
Our Canadian operations delivered 46,000 t in 4Q10, 20,000t higher than 3Q10. In addition to the
better performance of Voiseys Bay, there was a contribution of copper ores purchased from third
parties in previous quarters and processed into copper concentrates and anodes in Sudbury in 4Q10.
These purchases allowed us to increase copper shipments in an environment of rising prices.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
|
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
COBALT (metric tons) |
|
|
133 |
|
|
|
133 |
|
|
|
624 |
|
|
|
1,575 |
|
|
|
1,066 |
|
|
|
367.9 |
% |
|
|
368.0 |
% |
|
|
-32.3 |
% |
Sudbury |
|
|
0 |
|
|
|
39 |
|
|
|
258 |
|
|
|
359 |
|
|
|
302 |
|
|
|
563.4 |
% |
|
|
n.m. |
|
|
|
-15.8 |
% |
Thompson |
|
|
70 |
|
|
|
34 |
|
|
|
30 |
|
|
|
181 |
|
|
|
189 |
|
|
|
-11.2 |
% |
|
|
-57.3 |
% |
|
|
4.3 |
% |
Voisey Bay |
|
|
63 |
|
|
|
60 |
|
|
|
288 |
|
|
|
971 |
|
|
|
524 |
|
|
|
378.7 |
% |
|
|
358.6 |
% |
|
|
-46.1 |
% |
Others |
|
|
0 |
|
|
|
1 |
|
|
|
48 |
|
|
|
64 |
|
|
|
51 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
-20.2 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PLATINUM (000 oz troy) |
|
|
2 |
|
|
|
3 |
|
|
|
26 |
|
|
|
103 |
|
|
|
35 |
|
|
|
756.7 |
% |
|
|
1446.6 |
% |
|
|
-65.8 |
% |
Sudbury |
|
|
2 |
|
|
|
3 |
|
|
|
26 |
|
|
|
103 |
|
|
|
35 |
|
|
|
756.7 |
% |
|
|
1446.6 |
% |
|
|
-65.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PALLADIUM (000 oz troy) |
|
|
4 |
|
|
|
7 |
|
|
|
35 |
|
|
|
152 |
|
|
|
60 |
|
|
|
378.1 |
% |
|
|
721.0 |
% |
|
|
-60.5 |
% |
Sudbury |
|
|
4 |
|
|
|
7 |
|
|
|
35 |
|
|
|
152 |
|
|
|
60 |
|
|
|
378.1 |
% |
|
|
721.0 |
% |
|
|
-60.5 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
GOLD (000 oz troy) |
|
|
3 |
|
|
|
5 |
|
|
|
27 |
|
|
|
50 |
|
|
|
42 |
|
|
|
481.4 |
% |
|
|
864.6 |
% |
|
|
-15.8 |
% |
Sudbury |
|
|
3 |
|
|
|
5 |
|
|
|
27 |
|
|
|
50 |
|
|
|
42 |
|
|
|
481.4 |
% |
|
|
864.6 |
% |
|
|
-15.8 |
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SILVER (000 oz troy) |
|
|
26 |
|
|
|
194 |
|
|
|
443 |
|
|
|
1,245 |
|
|
|
1,492 |
|
|
|
127.8 |
% |
|
|
1582.8 |
% |
|
|
19.9 |
% |
Sudbury |
|
|
26 |
|
|
|
194 |
|
|
|
443 |
|
|
|
1,245 |
|
|
|
1,492 |
|
|
|
127.8 |
% |
|
|
1582.8 |
% |
|
|
19.9 |
% |
7
|
|
|
|
|
Production Report |
|
|
|
|
Similarly to nickel, there was a sharp increase in the production of cobalt, platinum
group metals and precious metals in 4Q10.
Cobalt production in 4Q10 was 624,000 t, up 491,000 t from 3Q10 due to the ramping up of operations
in Sudbury after the end of the labor interruption.
Production of platinum and palladium in 4Q10 was 61,000 troy ounces, which was 51,000 troy ounces
higher than in 3Q10 and 55,000 troy ounces higher than 4Q09.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BAUXITE |
|
|
3,318 |
|
|
|
3,801 |
|
|
|
3,851 |
|
|
|
12,461 |
|
|
|
14,332 |
|
|
|
1.3 |
% |
|
|
16.0 |
% |
|
|
15.0 |
% |
Trombetas |
|
|
1,738 |
|
|
|
1,883 |
|
|
|
1,834 |
|
|
|
6,258 |
|
|
|
6,808 |
|
|
|
-2.6 |
% |
|
|
5.5 |
% |
|
|
8.8 |
% |
Paragominas |
|
|
1,580 |
|
|
|
1,918 |
|
|
|
2,017 |
|
|
|
6,203 |
|
|
|
7,524 |
|
|
|
5.2 |
% |
|
|
27.6 |
% |
|
|
21.3 |
% |
Our production of bauxite in 2010 achieved an all-time high at 14.332 Mt, showing a
significant growth against the mark 12.461 Mt in 2009. Due to the conclusion and further expansion
of the Paragominas mining operations our bauxite production has more than doubled over the last
five years, coming from 6.884 Mt in 2005 to 14.332 Mt in 2010.
A record quarterly output was reached in 4Q10, when Vales bauxite production totaled 3.851 Mt,
1.3% higher on a quarter-on-quarter basis and 15% year-on-year.
Vales production at Trombetas was slightly lower than during the previous quarter. But, on the
other hand, Paragominas output reached an all-time high production of 2.0 Mt, 5.2% higher than
3Q10.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ALUMINA |
|
|
1,477 |
|
|
|
1,442 |
|
|
|
1,448 |
|
|
|
5,910 |
|
|
|
5,805 |
|
|
|
0.4 |
% |
|
|
-2.0 |
% |
|
|
-1.8 |
% |
Alunorte |
|
|
1,477 |
|
|
|
1,442 |
|
|
|
1,448 |
|
|
|
5,910 |
|
|
|
5,805 |
|
|
|
0.4 |
% |
|
|
-2.0 |
% |
|
|
-1.8 |
% |
The production of alumina at the Barcarena refinery totalized 1.4 Mt in 4Q10, in line with its
capacity.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ALUMINUM |
|
|
112 |
|
|
|
114 |
|
|
|
114 |
|
|
|
459 |
|
|
|
447 |
|
|
|
0.4 |
% |
|
|
1.8 |
% |
|
|
-2.6 |
% |
Albrás |
|
|
112 |
|
|
|
114 |
|
|
|
114 |
|
|
|
450 |
|
|
|
447 |
|
|
|
0.4 |
% |
|
|
1.8 |
% |
|
|
-0.6 |
% |
Valesul |
|
|
0 |
|
|
|
|
|
|
|
|
|
|
|
9 |
|
|
|
0 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
The production of aluminum totalized 114,000 t in 4Q10, in line with quarterly and annual
bases.
8
|
|
|
|
|
Production Report |
|
|
|
|
FERTILIZER NUTRIENTS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
POTASH |
|
|
185 |
|
|
|
155 |
|
|
|
169 |
|
|
|
717 |
|
|
|
662 |
|
|
|
9.0 |
% |
|
|
-8.8 |
% |
|
|
-7.6 |
% |
Taquari-Vassouras |
|
|
185 |
|
|
|
155 |
|
|
|
169 |
|
|
|
717 |
|
|
|
662 |
|
|
|
9.0 |
% |
|
|
-8.8 |
% |
|
|
-7.6 |
% |
In 4Q10, production of potash was 169,000 t, a volume 14,000 t higher than 3Q10. The
rise in output is explained by an improvement in asset utilization in mining.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Phosphate Rock |
|
|
n.a. |
|
|
|
1,198 |
|
|
|
1,787 |
|
|
|
n.a. |
|
|
|
5,255 |
|
|
|
49.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
721 |
|
|
|
725 |
|
|
|
n.a. |
|
|
|
2,737 |
|
|
|
0.6 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fosfatados |
|
|
n.a. |
|
|
|
477 |
|
|
|
480 |
|
|
|
n.a. |
|
|
|
1,727 |
|
|
|
1.8 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Bayóvar |
|
|
n.a. |
|
|
|
209 |
|
|
|
582 |
|
|
|
n.a. |
|
|
|
791 |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MAP Monoammonium phosphate |
|
|
n.a. |
|
|
|
229 |
|
|
|
245 |
|
|
|
n.a. |
|
|
|
898 |
|
|
|
7.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
229 |
|
|
|
245 |
|
|
|
n.a. |
|
|
|
898 |
|
|
|
7.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TSP Triple superphosphate |
|
|
n.a. |
|
|
|
229 |
|
|
|
162 |
|
|
|
n.a. |
|
|
|
788 |
|
|
|
-29.4 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
229 |
|
|
|
162 |
|
|
|
n.a. |
|
|
|
788 |
|
|
|
-29.4 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SSP -Single superphosphate |
|
|
n.a. |
|
|
|
687 |
|
|
|
586 |
|
|
|
n.a. |
|
|
|
2,240 |
|
|
|
-14.7 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fosfatados |
|
|
n.a. |
|
|
|
637 |
|
|
|
545 |
|
|
|
n.a. |
|
|
|
2,147 |
|
|
|
-14.5 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
50 |
|
|
|
41 |
|
|
|
n.a. |
|
|
|
92 |
|
|
|
-18.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DCP Dicalcium Phosphate |
|
|
n.a. |
|
|
|
144 |
|
|
|
101 |
|
|
|
n.a. |
|
|
|
491 |
|
|
|
-29.8 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fosfatados |
|
|
n.a. |
|
|
|
144 |
|
|
|
101 |
|
|
|
n.a. |
|
|
|
491 |
|
|
|
-29.8 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fosfatados owns two phosphate rock mines, Araxá, in the state of Minas Gerais, and Cajati, in the state of São Paulo, Brazil.
Alongside the mining operations, the assets also comprise four processing plants for the production of phosphates fertilizers
located at: (a) Araxá, state of Minas Gerais; (b) Cajati, state of São Paulo; (c) Cubatão, state of São Paulo; (d) Guará, state of
São Paulo.
Total production of phosphate rock, which is used to feed the output of phosphate
nutrients, rose 49.1% compared to 3Q10. Vale Fertilizantes and Vale Fosfatados had an output
performance in line with 3Q10. Bayóvar, our Peruvian phosphate rock mine, started to ramp up
production in July and produced 582,000 metric tons in 4Q10.
The production of MAP (monoammonium phosphate) was 245,000 t, up 7.1% quarter-on-quarter, in
response to the stronger demand in the Brazilian market.
9
|
|
|
|
|
Production Report |
|
|
|
|
TSP (triple superphosphate) production decreased 29.4% compared to 3Q10, due to a maintenance
stoppage in 4Q10.
The production of SSP (single superphosphate) from Vale Fosfatados reduced 14.5% from 3Q10 due to
the maintenance stoppage in the Cubatão plant. Production of Vale Fertilizantes was 18.1% lower
than in previous quarter due to a maintenance stoppage at the Catalão plant.
DCP (dicalcium phosphate) decreased by 29.8% on a quarter-on-quarter basis due to a maintenance
stoppage at the Araucária plant.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% Change |
|
|
% Change |
|
|
% Change |
|
000 metric tons |
|
4Q09 |
|
|
3Q10 |
|
|
4Q10 |
|
|
2009 |
|
|
2010 |
|
|
4Q10/3Q10 |
|
|
4Q10/4Q09 |
|
|
2010/2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ammonia |
|
|
n.a. |
|
|
|
108 |
|
|
|
140 |
|
|
|
n.a. |
|
|
|
508 |
|
|
|
29.3 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
108 |
|
|
|
140 |
|
|
|
n.a. |
|
|
|
508 |
|
|
|
29.3 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Urea |
|
|
n.a. |
|
|
|
77 |
|
|
|
146 |
|
|
|
n.a. |
|
|
|
511 |
|
|
|
90.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
77 |
|
|
|
146 |
|
|
|
n.a. |
|
|
|
511 |
|
|
|
90.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nitric Acid |
|
|
n.a. |
|
|
|
119 |
|
|
|
120 |
|
|
|
n.a. |
|
|
|
454 |
|
|
|
1.0 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
119 |
|
|
|
120 |
|
|
|
n.a. |
|
|
|
454 |
|
|
|
1.0 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ammonium Nitrate |
|
|
n.a. |
|
|
|
115 |
|
|
|
115 |
|
|
|
n.a. |
|
|
|
447 |
|
|
|
0.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
Vale Fertilizantes |
|
|
n.a. |
|
|
|
115 |
|
|
|
115 |
|
|
|
n.a. |
|
|
|
447 |
|
|
|
0.1 |
% |
|
|
n.m. |
|
|
|
n.m. |
|
In 4Q10 ammonia production increased 29.3% compared to 3Q10 due to the scheduled
maintenance stoppage in the Araucária unit in 3Q10.
For further information. please contact:
+55-21-3814-4540
Roberto Castello Branco: roberto.castello.branco@vale.com
Viktor Moszkowicz: viktor.moszkowicz@vale.com
Carla Albano Miller: carla.albano@vale.com
Andrea Gutman: andrea.gutman@vale.com
Fernando Frey: fernando.frey@vale.com
Marcio Loures Penna: Marcio.penna@vale.com
Samantha Pons: samantha.pons@vale.com
Thomaz Freire: thomaz.freire@vale.com
This press release may include declarations about Vales expectations regarding future events or
results. All declarations based upon future expectations. rather than historical facts. are subject
to various risks and uncertainties. Vale cannot guarantee that such declarations will prove to be
correct. These risks and uncertainties include factors related to the following: (a) the countries
where Vale operates. mainly Brazil and Canada; (b) the global economy; (c) capital markets; (d) the
mining and metals businesses and their dependence upon global industrial production. which is
cyclical by nature; and (e) the high degree of global competition in the markets in which Vale
operates. To obtain further information on factors that may give rise to results different from
those forecast by Vale. please consult the reports filed with the Brazilian Comissão de Valores
Mobiliários (CVM). the French Autorité des Marchés Financiers (AMF). and with the U.S. Securities
and Exchange Commission (SEC). including Vales most recent Annual Report on Form 20F and its
reports on Form 6K.
10
Signatures
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused
this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
|
|
Vale S.A.
(Registrant)
|
|
|
By: |
/s/ Roberto Castello Branco
|
|
Date: February 24, 2011 |
|
Roberto Castello Branco |
|
|
|
Director of Investor Relations |
|
|
11